Connect with us

News

What is a Fire Safety Certificate?

Published

on

0256336_JP_Healy_1000x600.jpg

By John Healy of Healy Insurances

A Fire Safety Certificate is an official document that verifies if a building design submitted as part of an application will, if constructed in accordance with the plans and specifications approved by the Building Control Authority, comply with the requirements of the Building Regulations.

Fire Safety Certificates are issued by a Building Control Authority. The certificate confirms that the building has adequate escape facilities and that the building is designed in a way that prevents and limits the spread of fire. While all buildings must comply with the fire regulations, not all buildings will need a Fire Safety Certificate.

Which developments require a Fire Safety Certificate?

The Building Control Act (1990 & 2007) specifies the development types that require Fire Safety Certificates:

· Works in connection with the design and construction of a new building
· Works in connection with the material alteration of a day centre, a building containing a flat, a hotel, hostel or guest building, an institutional building, a place of assembly, a shopping centre
· Works in connection with the material alteration of a shop, office or industrial building where additional floor area is being provided within the existing building or where the building is being sub-divided into a number of units for separate occupancy
· Works in connection with the extension of a building by more than 25 square metres
· A building as regards which a material change of use takes place.

Some developments are exempted from requiring a Fire Certificate and can include:

· Certain single storey agricultural buildings
· A building used as a dwelling (other than a flat)
· A single storey domestic garage
· A single storey building ancillary to a dwelling which is used exclusively for recreational or storage purposes or the keeping of plants, birds or animals for domestic purposes and is not used for any trade or business or for human habitation
· Works in connection with a Garda station, a courthouse, a barracks and certain government buildings.

If a building is inspected by a member of the building control authority and it transpired that no Fire Safety Certificate is in place, the building could be subject to closure. For more information see www.kerrycoco.ie/home3/building-control/firesafetycerts.

Advertisement

News

Lochanna Beo’s mapping highlights water quality concerns

Published

on

By

Lochanna Beo’s mapping highlights water quality concerns


Local environmental action group Lochanna Beo has released mapping data from the Environmental Protection Agency (EPA) to draw attention to deteriorating water quality across Killarney and the broader Laune Catchment.


The EPA map uses a colour-coded system to rate water quality status from 2019 to 2024: blue indicates high status, green indicates good, yellow represents moderate, brown denotes poor, and red signifies bad status.
The figures indicate significant ecological pressure on local lakes and rivers compared to neighbouring areas across County Kerry.
Formed during the summer of 2026, Lochanna Beo aims to bring together residents, business owners, agricultural operators, and public bodies to address the key factors affecting the regional aquatic ecosystem.
The community initiative is seeking direct engagement with relevant statutory authorities to implement practical restoration measures and protect the long-term health of Killarney’s water bodies.

Continue Reading

News

Stefan Caulfield-Dreier signs professional cycling contract

Published

on

By


Former Killarney Cycling Club rider Stefan Caulfield-Dreier has secured a professional contract with leading Dutch-based outfit Azerion-Villa Valkenburg.


The 23-year-old Beaufort native began his cycling career with Killarney Cycling Club in the under-12 age category. He demonstrated strong potential during his youth career, culminating in a victory at the Under-16 National Time-Trial Championship in 2019.
After progressing through the junior ranks, Caulfield-Dreier began racing on the Continent with a Dutch squad upon entering senior competition. He claimed Senior National Track titles in both the Points and Madison events in 2023 and 2024, and went on to represent Ireland at international track events in the Netherlands and Switzerland across 2024 and 2025.
Announcing the signing, team management at Azerion-Villa Valkenburg highlighted Caulfield-Dreier as a specialist in classics and time trials who excels in demanding race conditions.
Killarney Cycling Club Chairman Kevin Murphy welcomed the announcement, praising the former member’s dedication.
“Stefan has shown enormous persistence and resilience, and we are delighted that he has been recognized and rewarded with this big step-up in his career,” Murphy said.
Caulfield-Dreier’s father, Heiko, runs Killorglin-based firm Aqua Design and has been a long-standing supporter of Killarney Cycling Club.

Stefan Caulfield-Dreier signs professional cycling contract


Former Killarney Cycling Club rider Stefan Caulfield-Dreier has secured a professional contract with leading Dutch-based outfit Azerion-Villa Valkenburg.


The 23-year-old Beaufort native began his cycling career with Killarney Cycling Club in the under-12 age category. He demonstrated strong potential during his youth career, culminating in a victory at the Under-16 National Time-Trial Championship in 2019.
After progressing through the junior ranks, Caulfield-Dreier began racing on the Continent with a Dutch squad upon entering senior competition. He claimed Senior National Track titles in both the Points and Madison events in 2023 and 2024, and went on to represent Ireland at international track events in the Netherlands and Switzerland across 2024 and 2025.
Announcing the signing, team management at Azerion-Villa Valkenburg highlighted Caulfield-Dreier as a specialist in classics and time trials who excels in demanding race conditions.
Killarney Cycling Club Chairman Kevin Murphy welcomed the announcement, praising the former member’s dedication.
“Stefan has shown enormous persistence and resilience, and we are delighted that he has been recognized and rewarded with this big step-up in his career,” Murphy said.
Caulfield-Dreier’s father, Heiko, runs Killorglin-based firm Aqua Design and has been a long-standing supporter of Killarney Cycling Club.


Former Killarney Cycling Club rider Stefan Caulfield-Dreier has secured a professional contract with leading Dutch-based outfit Azerion-Villa Valkenburg.


The 23-year-old Beaufort native began his cycling career with Killarney Cycling Club in the under-12 age category. He demonstrated strong potential during his youth career, culminating in a victory at the Under-16 National Time-Trial Championship in 2019.
After progressing through the junior ranks, Caulfield-Dreier began racing on the Continent with a Dutch squad upon entering senior competition. He claimed Senior National Track titles in both the Points and Madison events in 2023 and 2024, and went on to represent Ireland at international track events in the Netherlands and Switzerland across 2024 and 2025.
Announcing the signing, team management at Azerion-Villa Valkenburg highlighted Caulfield-Dreier as a specialist in classics and time trials who excels in demanding race conditions.
Killarney Cycling Club Chairman Kevin Murphy welcomed the announcement, praising the former member’s dedication.
“Stefan has shown enormous persistence and resilience, and we are delighted that he has been recognized and rewarded with this big step-up in his career,” Murphy said.
Caulfield-Dreier’s father, Heiko, runs Killorglin-based firm Aqua Design and has been a long-standing supporter of Killarney Cycling Club.

Continue Reading