Connect with us

News

Local mountain runner preparing for 176km French race

Published

on

By Sean Moriarty

Killarney-based mountain runner Joe O’Leary used last weekend’s Skyline Reeks race as one of his preparation events for next month’s Ultra-Trail du Mont-Blanc.

Competitive mountain running returned to the McGillcuddy Reeks last Saturday and while the 30km course may sound difficult to the uninitiated, O’Leary has his eye on the 176km French classic which takes place from August 22 to 29.

On Saturday members of the Irish Mountain Runners Association ran, climbed and scrambled from Cronin’s Yard, in blistering heat over Cruach Mhór (933m), The Big Gun, Cnoc na Péiste, (988m), Maolán Buí (973m), Cnoc an Chuillinn (926m), summiting Carrauntoohil (1039m), in blistering heat, and onto Binn Chaorach (1010m) and back to Cronin’s Yard via Croc Broinne (854m).

The event was hosted by Munster Mountain Runners Association and organised by Robbie Williams and his volunteer crew.

O’Leary completed the course in 05hrs 05mins 08secs.

Such was the heat and conditions, his time was considerably slower than his previous efforts in the race.

“I easily lost 20 minutes, maybe 30,” O’Leary told the Killarney Advertiser. “It was horrendous, everyone suffered [in the heat].”

The event was won by Ruairí Long in a time of 03hrs 58mins and 41 seconds.

Rosy Temple was the first lady competitor to finish in an unbelievable time of 05hrs 41mins 33secs.
Kevin Leahy was the best local in a time of 04hrs 51mins 08secs.

O’Leary is one of Ireland’s top mountain runners. He is currently preparing for the Ultra-Trail du Mont-Blanc a 176km mountain race in the French, Italian and Swiss Alps. He will race as high a 10,000 metres during that event and it is his second time competing in it having previously done the 160km version two years ago. On that occasion he ran for 28 hours almost non-stop.

He also tackled a night marathon in the Ballyhoura Forest Complex on Friday night before repeating the same course in daylight on Saturday morning.

“I'm doing the night race and the day race back-to-back as practice,” he added.

Advertisement

News

Design team appointed for injury unit

Published

on

By

Design team appointed for injury unit


A design team has been appointed to advance plans for the proposed Minor Injury Unit on the grounds of St Columbanus Home though the HSE has confirmed it cannot yet give a construction or opening timeline.
Fianna Fáil TD Deputy Michael Cahill received the update in response to a Parliamentary Question submitted to the Minister for Health. HSE South West confirmed the newly appointed team will progress the project through design development, planning, and regulatory approval following the transfer of residents to the new Killarney Community Nursing Unit.
Deputy Cahill welcomed the appointment of the design team but raised concerns over the lack of a definitive schedule.
“I welcome the appointment of a design team, which represents progress towards delivering this important facility. However, I am concerned that the HSE is still unable to provide a definitive timeline. Previous indications from HSE officials pointed towards construction commencing in 2026, with completion anticipated in 2027. We now need clarity on the project schedule and assurances that there will be no unnecessary delays,” Deputy Cahill said.
He noted that the facility is vital to serve Killarney and the wider east, mid, and south Kerry regions while relieving pressure on the Emergency Department at University Hospital Kerry.
The HSE also confirmed it is finalising a broader review of healthcare accommodation across Killarney to develop the St Columbanus campus as an integrated healthcare hub.
“As a member of the Oireachtas Joint Committee on Health, I will continue to press the HSE and the Minister for Health to ensure this project is progressed without further delay. People across Killarney, east, mid, west and south Kerry deserve certainty. The appointment of a design team is welcome but the next priority must be getting this project to construction and delivering the facility,” Deputy Cahill concluded.

Attachments

Continue Reading

News

Lochanna Beo’s mapping highlights water quality concerns

Published

on

By

Lochanna Beo’s mapping highlights water quality concerns


Local environmental action group Lochanna Beo has released mapping data from the Environmental Protection Agency (EPA) to draw attention to deteriorating water quality across Killarney and the broader Laune Catchment.


The EPA map uses a colour-coded system to rate water quality status from 2019 to 2024: blue indicates high status, green indicates good, yellow represents moderate, brown denotes poor, and red signifies bad status.
The figures indicate significant ecological pressure on local lakes and rivers compared to neighbouring areas across County Kerry.
Formed during the summer of 2026, Lochanna Beo aims to bring together residents, business owners, agricultural operators, and public bodies to address the key factors affecting the regional aquatic ecosystem.
The community initiative is seeking direct engagement with relevant statutory authorities to implement practical restoration measures and protect the long-term health of Killarney’s water bodies.

Continue Reading

Last News

Sport