Connect with us

News

Works on Killarney Cultural Centre near completion

Published

on

NEARLY THERE: Refurbishment and renovation works continuing at the Killarney Cultural Centre. Picture: Eamonn Keogh

By Sean Moriarty

Refurbishment work on the Killarney Cultural Centre on the East Avenue Road is near completion.

The building has been revamped at a cost of €240,000 with half of the cost being provided by the Department of Arts, Heritage and the Gaeltacht and the other half by Kerry County Council.
“The aim is to make the new arts centre a flexible and adaptable space both internally and in particular outside. We proposed to re-design the front façade, with a metal structure with black mirror cladding which reflects the trees at the back of the auditorium area,” stated the Council when plans were first unveiled in December 2017. “The paved area proposed will be a concrete surface with a number of landscaped areas. We propose to use water repellent spray and stencils to inscribe quotations from poets who have visited Killarney or who are currently associated with the area. The paving is designed to show these inscriptions on wet days.”

The outdoor area will be covered with a retractable canopy and will be a flexible area that will seat an audience which can view a show on the internal stage or an external stage.

Advertisement

News

LOCAL GOLD:

Published

on

By

LOCAL GOLD: Terrie O’Shea, founder and owner of Killarney-based business Sorella Berries, celebrating her Gold award win at the Blas na hÉireann Irish Food Awards held in Dingle last week. Her hand-crafted chocolate covered strawberries secured the top spot in national competition, earning recognition for the local food producer on the national stage.

LOCAL GOLD:

Attachments

Continue Reading

News

Grady demands Killarney traffic review

Published

on

By

Killarney councillor Martin Grady has called for an urgent review of traffic management across the town following severe delays along the Muckross Road during the morning rush hour.

Constituents living along Muckross Road, Woodlawn, and outer Muckross areas raised serious concerns with the local representative, reporting that motorists now face delays of over 30 minutes to travel from Flesk Bridge or Woodlawn Cross into Killarney town.


The situation is causing major disruption for parents doing school runs and commuters traveling to work every morning.


“This level of congestion is simply not acceptable,” said Cllr Grady. “I have been contacted by constituents who are experiencing significant delays every morning, with parents trying to get their children to school and people trying to commute into work being caught in traffic for prolonged periods.”


Cllr Grady urged Kerry County Council to look closely at the operation and light sequencing along the route.


“I am calling for a review of the traffic situation along the Muckross Road, including the operation and sequencing of the traffic lights and whether there are any other obstructions or traffic management issues contributing to the delays,” he said.


He stressed that the gridlock is not isolated to one approach road, but affects the entire urban area as population and traffic volumes continue to rise year on year.


“But this issue goes beyond the Muckross Road. Killarney as a whole is experiencing increasing levels of traffic congestion across the town. The people of Killarney have been suffering with traffic for far too long, and the situation is getting worse,” Cllr Grady said.


“Our population is growing and traffic volumes are increasing year on year. We need to look at the bigger picture and develop a proper traffic management plan for Killarney. We need to identify where the problems are, examine how traffic is being managed across the town and put measures in place to improve traffic flow. The current situation has gone beyond what is acceptable for residents, commuters and visitors to Killarney.”

Continue Reading

Last News

Sport