Connect with us

News

Macroom bypass to fully open on Monday

Published

on

0266629_rsb0trrh5wur1a00e9oulptswgz5bqa.jpg

One of the country’s most eagerly anticipated road projects - Macroom Bypass – is due to fully open on Monday.

The final section of the Macroom bypass between Ballyvourney and Ballymakeera is all but complete and can expect to see its first traffic on Monday morning.

Traffic will now by-pass the villages of Ballyvourney and Ballymakerra shortening the distance between Cork city and Killarney.

The project has been completed ahead of its 2024 schedule.

Cork County Council signed contracts with two Irish firms, Jons Civil Engineering Ltd and John Cradock Ltd, in November 2019 for a total budget of €280 million, in what was the largest single investment by government in the region at the time.

Work started in January 2020 with up to 260 construction staff employed on site at the peak of the project and continuing throughout the Covid pandemic.

In December 2020, seven precast concrete bridge beams, the longest ever for Ireland and the UK at 49.9 metres in length, made their way to Macroom with the assistance of a Garda escort over 4 nights.

With only 200mm height to spare traveling through the Jack Lynch Tunnel, one of the biggest challenges was reversing the 155 tonne beams into position with only inches to spare at the existing stone arch “New Bridge” in Macroom. The new section of road consists of two lanes in each direction separated by a steel median barrier. A total of 48 principal structures were built including three river bridges, three overbridges and four under bridges, walls, culverts and environmental barriers for noise reduction and 132,000 square metres of pavement.

Advertisement

News

KWD Recycling shortlisted for national environmental awards

Published

on

By

KWD Recycling shortlisted for national environmental awards


Killarney-based KWD Recycling has been announced as a finalist in the 2026 Repak Resource Awards, securing a spot on the national shortlist for environmental achievement.


The local waste management company has been nominated in the Best Recovery Operator Innovation category, sponsored by DNV, for its state-of-the-art residual waste recovery system.
The Killarney facility utilizes optical sorting, screening, and mechanical processing to extract recyclable plastics and organic material from municipal waste. In its first year of operation, the technology recovered more than 10 per cent of plastic packaging from residual waste for recycling and diverted almost 50 per cent of organic material toward composting.
KWD Recycling will compete alongside Dublin operators Panda and Thorntons Recycling for the category title.
Repak CEO Zoe Kavanagh commended the Kerry firm for demonstrating environmental leadership and bringing local ambition to the national awards.
Category winners will be announced at a black-tie ceremony at the Mansion House in Dublin on Friday, October 23, where each winner will also compete for the Overall Repak Resource Award.
Local businesses have a strong track record at the national event, with Killarney town venue The Killarney Park and The Ross previously taking home the overall title in 2023.

Attachments

Continue Reading

News

Drivers warned as deer rutting season begins

Published

on

By

Drivers warned as deer rutting season begins


Motorists in Killarney are being urged to exercise extreme caution as the annual deer rutting season gets underway, causing animals to stray far beyond their usual habitats inside Killarney National Park.


The autumn mating season sees deer becoming highly active and unpredictable, leading to increased sightings and collisions on local roads outside traditional park boundaries.
Two separate incidents highlighted the growing hazard on local routes this week. A reader contacted the Killarney Advertiser to warn drivers after spotting a deer roaming near Tiernaboul towards the school on Sunday afternoon around 7.30pm.
Later that same night, in the early hours of Monday morning, a local driver collided with a deer near Kerry Airport around 1am while returning home from an event.
Despite attempting evasive action, the motorist struck the animal, which died at the scene and temporarily blocked the road before local Gardaí were alerted to clear the obstruction.
The driver sustained substantial vehicle damage, requiring repairs to the bumper, headlamp, and internal components, leaving her facing significant garage costs and time off the road.
Gardaí and road safety advocates advise motorists travelLing during early morning and late evening and remain vigilant along tree-lined routes.

Continue Reading

Last News

Sport